After several months of testing on the Haute Borne wind farm (80) of the Eurowatt Group, the Ingrid control solution integrating a WAGO France PLC has now been validated by Enedis (french DSO) as producer box compatible with the “eDEIE” device.
Diagram of the integration of the eDEIE and Ingrid Control on the wind farm power plant
A great thanks to Enedis, EDF R&D, Eurowatt Group and Wago France for this great partnership along these past years.
Congrats to all the teams involved for this great achievement towards the larger-scale deployment of the eDEIE!